LNG project in Guangdong Zhaoqing
Project name:LNG project in Guangdong Zhaoqing
Learn More
Project location:Zhaoqing city, Guangdong Province
Process: MRC Mixed Refrigeration Process、Atmospheric storage EPC total package -
Iraq AHDEB Oil Field Pipeline Lining-18” Water Injection Trunk
Steel pipe Specification: 18 "×17.48mm
Learn More
Lining Pipe Specification and Material: 424mm×12mm(HDPE)
Design Pressure: 16.5MPa
Operating Pressure: 11MPa
Medium and Temperature: High Sulfur Reinjection Water 45℃
Cumulative Engineering Quantity: 25km
Single Construction Length:800m -
Iraq AHDEB Oil Field Pipeline Lining-16” Gathering Pipeline
Steel pipe Specification: 16 "×10.31mm
Learn More
Lining Pipe Specification and Material: 388mm×12mm(PERT)
Design Pressure: 4MPa
Operating Pressure: 2MPa
Medium and Temperature:Petroleum,60℃
Construction Length:0.4km(Pipe of The River) -
SHELL Majnoon Oil Field NEW Pipeline Lining
Location:Shell Majnoon Oil Field;
Learn More
Client: Shell Corp;
Pipeline Specification:12”; API 5L X65
Flowing medium:sewage;
Operating pressure:4.7MPa;
Testing pressure: 6.4MPa;
Distance: 30KM -
“FOCUS” power plant (INDIA)
5 x 1500kW natural gas gen sets;
Learn More
4 x supportive compressors are used to generate power. -
AGY natural gas power plant (IRAN)
Capacity: 24MW.
Learn More
12 high-pressure natural gas gen sets and a CHP waste heat boiler unit;
To provide electricity for Iran AGY factory, and sent the excess power is transmits to the Iranian national power